The project site is located in Taoyuan City, from the intersection of Yanping Road and Shuren 3rd Street along Yanping Road to the southern road is connected with the road under National Freeway2. This bridge across through the detention basin and the total bridge length is 115m approximately (the length of the approach connected road is 30m and the width of the right-of-way is 20m). The design of the bridge and the overall landscape is mainly based on the view of detention basin and the design adopted lightweight and understated design. The bridge type adopted a three-span continuous I-beam steel bridge, which is located on the detention pond limited scouring concerns. The excavation depth of the bridge pier foundation reached 9m and merged with Department of Water Resources, Taoyuan City Government. |