The second phase of this project are all located within the New Taipei City; a total length of 13.3 kilometers (underground/elevated,) a total of 13 stations (2 underground stations and 11 elevated stations.)
All five urban planning along with the MRT line are required to statutory changes abided by the law. MRT construction belongs to the green public transportation.
Client:Department of Rapid Transit Systems Taipei City Government Length of Bridge:Total length of 13.3 km Location :Tucheng District, Shulin District, and Xinzhuang District, New Taipei City Construction Fees:approximately $1.8 Billion USD Dates:2016.10~
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)