繁體中文 GLOBAL SITES
簡體中文  
English  
   
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development  
Construction Management / Supervision
Inspection / Evaluation & Retrofit
Environmental Engineering
Water Resources / Soil Conservation  
Landscape Engineering / Landscap Lighting
 
 
 
 
 
 
 

The design and supervision service of Suao Port filling area(I), cofferdam repair
The design and supervision service of Suao Port filling area(I), cofferdam repair


Product Description

Taiwan International Ports Corporation has completed the polder construction of land reclamation (I)
in the 4th port (Suao Port) in 2011, and it has used the excavation earthwork to fill the new reclaimed
land due to land reclamation (I) is a semi-enclosed landfill area in order to provide the land usage for the
Yilan County Water Resources Plant and it also provide the length of 150 meters grouting works in land
reclamation (I). In 2016 September, Suao Port has invaded by longwave during typhoon Megi slam into
Taiwan. It has caused the damage on partial sea embankment of land reclamation (I) ,therefore, the repair
works of damaged embankment (approximately 200meters) should be executed in order to avoid filling
earthwork loss and ensure the safety of Suao Port facilities.

Moreover, after the commercial port range of Suao Port has designated. Some private residential area
and some national owned land in this port area are governed by National Property Administration
because of historical background. The land of the Doufu cape tourism area belongs to Suao port but it
has been entrusted to organize by Yilan County Government, yet only offshore waters supervise by
Maritime and Port bureau M.O.T.C. It is necessary to conduct a review and research and to adjust the
harbor range in Suao Port bay area in order to facilitate the management of commercial port in a
more effective way.

Scope of works:

1. Cofferdam works of the 4th Zone filling area (I) in Suao Port
2. Cofferdam wall repair of the 4th Zone filling area (I) in Suao Port
3. The feasibility study of Suao Port range adjustment
4. The official ship berthing area dredging works of Suao Port
5. Sewage treatment system work of Suao Port
6. Contracting and construction consulting service

Client:
Suao Port Branch Office, Port of Keelung, Taiwan International Ports Co.,
Construction Fees:
NTD150 millions (US$ 5 M)

 

 

 

 
TYLin_Logo_White.png
ABOUT TYLIN
NEWS
SERVICE
PROJECTS
CAREER
CONTACT US
© Copyright 2011 T.Y.Lin Taiwan Consulting Engineers.inc.

Founder

Company Profile

Organization Chart

Philosophy

Group Distribution

Certification

Awards

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Inspection / Evaluation & Retrofit

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Urban Planning

BIM(Building Information Modeling)