Gungsan phase I sewage sewer system designed and supervised by TY Lin TW, include I-III sectors, with a planned area of 719 hectares. It covered a total of 10 administrative areas; including the old urban area of Ciaotou and the demonstration community of Kaohsiung new urban (also known as the 1st development zone), the second and south areas of Dienbow creek, the latest development zone. Total area of the sewerage system case is about 703 hectares, with the adjacent sewage treatment plant next to the Ciaotou District and Bixiu Li (Intersection area of Linxi and Lintoe Road),which about 16 hectares. This project adopted short pipe (Ф300mm diameter), and the main pipe (Ф1200mm diameter). To limit the underground pipelines import to the households and nearby traffic, push-forward construction method is adopted. This project completed in April 2019.
Client: Government of Kaohsiung city Project scope: The total planned area of the project is about 719 hectares, and the whole district is located in the “Special Area Plan of Kaohsiung new urban”. 10 administrative areas included, i.e Shihe, Shilong, Shifeng, Baishu, Donglin, Bixiu, Xinzhuang, Desong, Ciaonan, Ciaotou, etc. Construction Fees: NTD$ 123,561,981.- Location: Ciaotou dist. ,Kaohsiung city Dates: 2014.03~2019.04
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)