The construction work of Doulio City sewerage system is a turnkey project. Based on the wastewater catch basin of the city, two trunk sewers, A and B, are planned. The length of trunk sewer A is about 4,052m, while trunk sewer B is about 2,071m(deduct the bid part), both with diameters from ∮300mm to ∮1,000mm. Burying of trunk sewer in downtown area uses mainly pipe jacking. The section of trunk sewer buried across Yunlin River is constructed using open cut method with the help of a temporary cofferdam to divert flow. Before backfilling, it is covered with reinforced concrete for protection.
Client:Yunlin County Government
Location:Doulio City, Yunlin County
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)