The total length of main line for this project is about 34.715km. The scope includes widening from 2-lane to 3-lane for embankment, bridges and culverts on each side. In addition it also includes improvement for three interchanges (i.e. Chiai, Shuei-Shang, Hsin-Yin), one toll plaza, one service area, and one engineering office. The design feature for this section is fixed on landscape design along the main line and beautifies the roof shape of toll plaza. Besides remolding the outlook of building in service area, the scope also added one "fast through service" for small car passengers.
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)