Two 21km long viaducts built along existing S.Y.S. Freeway which is heavily congested at all times. To accommodate local environment and maintain traffic flow, various types of superstructures have been contemplated and designed including P.C. I-girders, steel box girders, cantilever P.C. box girders, C.I.P. double T girders; substructures are single column type with variable or constant cross sections. Foundation types include reverse circulation piles, C.I.P concrete piles with full casing , and R.C. caissons.
Location:Along existing S.Y.S. Freeway starting from Hsichih system interchange at the north and ending at Wuku interchange
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)