A four-lane freeway with a design velocity of 100 K/H connects northern to provincial highway No. 9 and southern to the delta of Taimali river. The whole length of it is 22.9 Km which includes embankment 10.1Km, Viaduct 8.8Km, tunnel 4 Km and three sets of interchange. With the longest span of 150m, the viaducts cross over Li-cha River, Chi-ban River, Wen-lee River and cross the south circuit railway twice. All bridges crossed over rivers were designed through the newest earthquake isolation analysis. Besides, sightseeing parking lot and public art presence etc. are all displayed in this project.
Client:Taiwan Area National Expressway Engineering Bureau, Ministry of Transportation and Communications
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)