繁體中文 GLOBAL SITES
簡體中文  
English  
   
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development  
Construction Management / Supervision
Inspection / Evaluation & Retrofit
Environmental Engineering
Water Resources / Soil Conservation  
Landscape Engineering / Landscap Lighting
 
 
 
 
 
 
 

Kao Hsuing Metropolitain Mass Rapid Transit System
Kao Hsuing Metropolitain Mass Rapid Transit System


Product Description

Kao Hsuing Metropolitain Mass Rapid Transit System And Engineering Private Participating Rapid Transit Program Technical Consultant Service (Part II)
 

Appointed by Kao Hsuing City Rapid Transit Bureau to assist and process related tasks for BOT form of the construction, operation on Kao Hsuing’s Red and Orange Line, total of 42.7KM including three main depots of Da-Liao, Chiao-Tou, and Hsiaokang. Also from the view point of engineering and operation, including land development and subsidial business operation, prepare the draft of the BOT contract documents and the request for proposal document (RFP), subsequent bidder’s contract condition negotiation and final contractual negotiation till the signing of the contract. The various tasks including following tasks:

(1) Review of the draft contract on private participating rapid transit project and prepare consultant’s opinion.
(2) Assist the bureau and prepare RFP on the private participating rapid transit (including main line and the      three depots’ technical consultant service and project planning).
(3) Budget plan control.
(4) Program related planning.
(5) Establish quality assurance and quality control program.
(6) Prepare the RFP documents on Independent Verification
     and Validity on rapid transit system including civil construction program.
(7) Provide consulting service on related client required tasks.

 
Client:Department of Rapid Transit.City of Taipei

Location:City and County of Kao Hsuing.

Red Line: Start at Northern Township of Chiau-Tau to South Lin-Hai Industrial Park.
Orange Line: Start at Eastern Chun-Shan University to West Da-Liao Main Depot.
 

 

 
TYLin_Logo_White.png
ABOUT TYLIN
NEWS
SERVICE
PROJECTS
CAREER
CONTACT US
© Copyright 2011 T.Y.Lin Taiwan Consulting Engineers.inc.

Founder

Company Profile

Organization Chart

Philosophy

Group Distribution

Certification

Awards

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Bridge / Viaduct

Freeway / Highway

High Speed Rail / Railway

Mass Rapid Transit

Airport

Building Structures

Land Development

Construction Management / Supervision

Inspection / Evaluation & Retrofit

Environmental Engineering

Water Resources / Soil Conservation

Landscape Engineering / Landscap Lighting

Urban Planning

BIM(Building Information Modeling)