Design Lot DE200 composed of two separate contracts, each comes with one civil contract, one E/M contract, one E/C contract, one elevator contract and one escalator contract. The whole package includes two underground stations, Nangang station (BL17)and Nangang business park south station(BL18), a crossover structure, a section of bored tunnel, and a C/C tunnel connected to a 3R joint tunnel shared by MRT, TRA and HSR. Nangang station links with neighbor TRA station with two entrances. The other station links with another MRT Neihu line, line, through an underground passage tunnel. Both stations are very essential as transfer stations of MRT lines.
The aspect of architecture about Nangang station is “Memory and Hi-tech” , which shows that the conventions could well exist on fine modern products. For the next station, “Digital space and Electricity station” presents a concept, which mixes modern, speed and hi-tech.
Client:Department of Rapid Transit System, Taipei Municipal Government
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)