Entire line is elevated except for a 810m long NATM tunnel. Vertical clearance is 5m to 7m and span length 25m to 75m. Precast concrete box girders are used for shorter spans with steel box girders for longer spans. All box girders are prefabricated and transported by truck to job site for assembly and installation. Elevated stations are 2 level steel structure supported by single columns founded in the street median. Station length is 80m and width varies from 20m to 30m and station height is 15m to 17m above the street level. Station exterior architecture is made of curtain wall finishes. Entrance buildings are typical two story R.C. structures The operation and maintenance depot contains the control center, workshops, maintenance shops, storage buildings, public parking, test track, and other service related structures.
Client:Department of Rapid Transit Systems, Taipei Municipal Government
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)