In 2013, T.Y. Lin International Taiwan, in a joint venture with NACO Netherlands Airport Consultants B.V, and WSP, was awarded the Technical Service of General Consultancy for the Taiwan Taoyuan International Airport’s Terminal 3 project. The joint venture will be responsible for providing planning, tender preparation, design review, and professional construction management services for Taiwan Taoyuan International Airport’s new world-class terminal.
Services provided by T.Y. Lin International Taiwan include : 1. Structural engineering for the terminal 2. Road and traffic planning 3. Drainage design 4. Geotechnical engineering services 5. Design review 6. Participation in the tendering process 7. Interface coordination The NT$75 billion (US$2.5 billion) project, which is scheduled for completion in 2020, calls for the development of the new terminal building, concourse and aprons, as well as service roads, ground service and operations facilities, taxiway system, and new passenger access roads. It also includes connecting the new terminal with the existing Terminal 2. The 4.8 hectare (11 acre) area between the two terminals will be developed as a multifunctional facility that will accommodate the airport’s ground transportation center, parking facilities and commercial real estate, with entertainment, shopping, and conference centers. Terminal 2 and 3 will both have stations served by the regional light rail system. The new terminal will be critical as the airport expands from its current 25 million passengers and 1.77 million tons of cargo each year to an estimated 59.8 million travelers and 4.48 million tons of cargo annually by 2030. The plan for the Terminal 3 area will also help facilitate Taiwan’s vision for the development of the Taoyuan region surrounding TTIA, which has been called the “Taoyuan Aerotropolis Project.” The region is slated for immense growth and economic development through new commercial, industrial and residential construction.
Client :Taoyuan International Airport Corporation Building scale : More than One million square meters Location : Taoyuan International Airport Construction Fees:75 billion Dates:2013.01~
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)