The Songshan East extension project contains 4.77km of tunnel (includes 4 tracks of HwaShan section, JinShan ChienKuo section, and Keelung ~ Songshan section), 0.89km of approach section, 2.76km of co-constructed section and 2 emergency dwelling stops (FuShing station and GuangFu station), 15 ventilation and emergency escape exits, 4 pumping stations, with a total of 8.42km long. The total length of Panchiao Wanhua extension project is about 15.3 km. TYLIN scope include: a dual track tunnel between Taipei ~ Wanhua; the Wanhua ~ Panchiao DaGuan Road Tunnel (Panchiao tunnel); the Hsintien river tunnel. .
Client : Railway Reconstruction Bureau, MOTC Length : Songshan East extension:8.42 Km Panchiao Wanhua extension:15.3 Km Location : Taipei City、New Taipei City
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)