Taoyuan County Highway No.19 is responsible for the external artery of the airport and Taoyuan Aerotropolis Cargo Area. This project contains the demolition and reconstruction of the spanning bridge across National Road No. 2 front and rear approach roads and road widening. In order to build an airport portal landmark and further shape the image of soaring wings, a special asymmetric single tower steel diagonal bridge is established, with a single span of 110m directly crossing National Highway No. 2, the bridge tower is 26.45m high, with a slight tilt of about 35 degrees to the north, the bridge lines are soft and simple, delivering the force and beauty of the bridge building process. In addition, in order to reduce the interference with road construction in the national roads and regions, the bridge adopts the method of first-built and post-relocation with jacking up and shaft construction method, which is the first example of this advanced way of bridge construction.
【Awards】
The 24th Chinese Golden Stone Award for Architecture in 2016 The 10th Golden Award by Minatory of Labor in 2016 The 1st Golden Prize by Taoyuan City Government in 2017 The 17th National Golden Award for Architecture in 2017 Merit Prize by Chinese Institute of Engineers in 2018
Client: Office of Construction, Taoyuan Length of Bridge: 110 meters Construction Fees: Approximately NT$500 million Location: Luzhu District, Taoyuan City Dates: 2013.11~2018.06
Founder
Company Profile
Organization Chart
Philosophy
Group Distribution
Certification
Awards
Bridge / Viaduct
Freeway / Highway
High Speed Rail / Railway
Mass Rapid Transit
Airport
Building Structures
Land Development
Construction Management / Supervision
Environmental Engineering
Water Resources / Soil Conservation
Landscape Engineering / Landscap Lighting
Inspection / Evaluation & Retrofit
Urban Planning
BIM(Building Information Modeling)